CoveringSolution - an insulated hallThe most often applied covering sytem is insulated system: sheeting - wool - sheeting aas the most economical and esthetical solution. Borga reccomends this solution as cost-effective. Below, there is an example of such a solution.![]()
In this solution, the walls and roof are filled with glass wool insulation. The assembly time at the buliding site is reduced because of the wind stopper already sticked to the surface in the production process. The wool is fitted exactly into the space between the girts, thereby eliminating material wastage. To prevent cold bridges on the walls, we use a 10mm insulation strips.
ObudowaSolution - a uninsulated hallThis solution is recomended when there is no need for heating the hall. Thanks to the DropStop layer applyed on the bottom side of the roof sheeting problem with the condensation is solved and the stored material is protected.![]()
The assembly is very quick due the prefabrication process. Each element of the construction: from the frames to the purlins come with pre-punched holes. It reduces the assembly process significantly. The metal sheeting of the roof and walls is connected to the construction with screws which are of the same colour as the sheeting.
|
||||||||